NEW·Helios & HexaGale Automated Laundry Systems Ready to install within 7 days Free on-site measurement across Singapore Island-wide delivery • DustHalo + IonDust +Voice Command • Smart App control NEW·Helios & HexaGale Automated Laundry Systems Ready to install within 7 days Free on-site measurement across Singapore Island-wide delivery • DustHalo + IonDust +Voice Command • Smart App control
+65 8818 3211 0 Enquire
Free On-Site Measurement

Get the perfect fit, measured free

Before you buy, we assess your space at no cost, on-site or virtually over WhatsApp, so your Smartvard automated laundry system fits and installs perfectly. Available island-wide across Singapore.

On-site assessment

What we check during a site visit

Our team confirms your space is ready and safe before installation, on concrete or false ceilings.

1

Load-bearing capacity

We confirm your concrete or false ceiling can safely support the unit's weight.

2

Space and clearance

We measure the available area and check for beams, fixtures or other obstacles.

3

Electrical points

We check nearby wiring and the power point so installation avoids interfering with utilities.

4

False-ceiling suitability

For false ceilings, we assess the structure and any reinforcement that may be needed.

5

Accessibility and integrity

We check ease of installation and servicing, and inspect for cracks or water damage.

6

Recommendation

You get a clear recommendation on the best-fit model and any preparation required.

No time to visit?

Virtual assessment over WhatsApp

Get a fast assessment from home in four simple steps.

1. Capture Take clear photos and a short video of your space
2. Send Share them with us on WhatsApp with any requirements
3. Evaluate Our team reviews and prepares an assessment
4. Recommend You receive model recommendations and next steps
Visit us

Prefer to come down?

See the full range at our Kaki Bukit showroom, Mon - Fri: 11:00am to 7:00pm Sat & Sun: 12pm-6pm.

Book your free measurement

No obligation. Island-wide across Singapore, with installation usually within 7 days.